Level 2 Building
The Level 2 Building class are working on the Automotive shed for our Level 1 Automotive class.
They have now completed the floor slab and are constructing the timber frames for the walls. These walls should be up before the end of term. In Term 2 they will be working on the roof framing and then attaching the roofing iron and wall cladding. The students are enjoying the learning and are working to a high standard.