Hero photograph
 

Rebuild Update

Natasha Powell —

Demolition continues across the Aldwins Road site to make room for the new build.

Good progress on the demolition is occurring on the Aldwins Road site. Many of the old buildings have already been removed including the technology workshops, gyms, music and drama space and hall.

The new build will enable teaching and learning to occur in purposefully designed responsive spaces; a mix of single cell rooms (the traditional classroom) and more open spaces designed for up to 60 students. The design of Linwood College was through consultation with staff at Linwood College and the Ministry of Education.