This week the inside of our Kōmingo block is being painted, and the Rurutu block is being gibbed.

Oaklands Redevelopment —

Inside the two blocks a steady pace is being maintained so they will be ready for students in Term 4.

There is some drainage work happening outside the Kōmingo block (in the junior part of the school) to ensure excess water drains away, and work is starting on building canopies over the front of the building to protect students from the sun.  

Construction crew prepare to erect the canopies providing shelter outside the  Kōmingo block. — Image by: Oaklands Redevelopment
Rurutu block (which joins onto the Yr 7/8 block) with 9 weeks until completion. — Image by: Oaklands Redevelopment
New drains and preparation for concreting around the back of the  Kōmingo block with 9 weeks until completion of the school redevelopment. — Image by: Oaklands Redevelopment