Back to basics.
The long brick blocks have been gutted and by the end of Term 3 their refurbishment will be complete.
The end result will look like this on the inside:
It will have a new half court behind it and a verandah/shade over the front entrance. It will also have several break-out areas and outdoor learning spaces.