One of the Canterbury blocks pictured in March 2020 after being gutted.
Photo by Oaklands Redevelopment
Back to basics.
The long brick blocks have been gutted and by the end of Term 3 their refurbishment will be complete.
The end result will look like this on the inside:
It will have a new half court behind it and a verandah/shade over the front entrance. It will also have several break-out areas and outdoor learning spaces.