Retaining some of Oaklands history.
Work is well underway to transform our two long brick blocks from the original school into modern learning spaces with the latest technology.
The blocks are being gutted and only the roof and brick shell kept. Retaining the red brick exteriors keeps a little bit of history and character of the original school that was built in the late 1960s.
Work on the two brick blocks is expected to be finished and ready for students to move into by Term 4.